Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 15 results ...

Çevikbaş, M, Okudan, O and Işık, Z (2022) New Delay-Analysis Method Using Modified Schedule and Modified Updated Schedule for Construction Projects. Journal of Construction Engineering and Management, 148(11).

Asghari, V, Wang, Y, Biglari, A J, Hsu, S and Tang, P (2022) Reinforcement Learning in Construction Engineering and Management: A Review. Journal of Construction Engineering and Management, 148(11).

Fathi, M and Shrestha, P P (2022) Public–Private Partnership Project Performance Analysis Compared to Design-Build in Highway Projects. Journal of Construction Engineering and Management, 148(11).

Feng, H, Song, Q, Yin, C and Cao, D (2022) Adaptive Impedance Control Method for Dynamic Contact Force Tracking of Robotic Excavators. Journal of Construction Engineering and Management, 148(11).

Gibson, G E, Sanboskani, H, El Asmar, M and Aramali, V (2022) Employing Technology to Enable Remote Research Charrettes as a Method for Engaging Industry and Uncovering Best Practices: A Novel Approach for a Post-COVID-19 World. Journal of Construction Engineering and Management, 148(11).

González-Cruz, M, Ballesteros-Pérez, P, Lucko, G and Zhang, J (2022) Critical Duration Index: Anticipating Project Delays from Deterministic Schedule Information. Journal of Construction Engineering and Management, 148(11).

Hajarolasvadi, H and Shahhosseini, V (2022) A System-Dynamic Model for Evaluating the Effect of Person–Team Fit on Project Performance. Journal of Construction Engineering and Management, 148(11).

Hebiba, A M, Bouferguene, A, Moon, S and Han, S (2022) Wind-Wise Automated Stability Analysis for Selection of Tower Crane and Location. Journal of Construction Engineering and Management, 148(11).

Li, L, Luan, H, Yin, X, Dou, Y, Yuan, M and Li, Z (2022) Understanding Sustainability in Off-Site Construction Management: State of the Art and Future Directions. Journal of Construction Engineering and Management, 148(11).

Liu, J, Wang, Y and Wang, Z (2022) Effect of Pressure on Construction Company Compliance Attitudes: Moderating Role of Organizational Ethical Climate. Journal of Construction Engineering and Management, 148(11).

Ma, H, Lv, K, Zeng, S, Lin, H and Shi, J J (2022) Climbing the Pyramid of Megaproject Social Responsibility: Impacts of External Stakeholders and Project Complexity. Journal of Construction Engineering and Management, 148(11).

Moharrami, S, Bayat, A and AbouRizk, S (2022) Modeling Microtunnel Boring Machine Penetration Rate Using a Mechanistic Approach. Journal of Construction Engineering and Management, 148(11).

Sharif, M M, Chuo, S and Haas, C T (2022) Rapid 3D Quality Control in Prefabrication Using a 3D Digital-Templates Framework. Journal of Construction Engineering and Management, 148(11).

Sun, G, Sun, J and Li, F (2022) Influencing Factors of Early Termination for PPP Projects Based on Multicase Grounded Theory. Journal of Construction Engineering and Management, 148(11).

Zuo, F, Zio, E and Yuan, Y (2022) Risk-Response Strategy Optimization Considering Limited Risk-Related Resource Allocation and Scheduling. Journal of Construction Engineering and Management, 148(11).